ADVERTISEMENT

Boat Plans & Kits

If you are a designer who offers plans, or kit boats, we invite you to enter your information in the Directory of Boat Plans & Kits. There is no charge! This is for boats of ANY hull material. And if you’re in the market for a boat to build, this is a fine place to start.

 

835 results for All Boat Plans & Kits

Panga25

Designer: 
Jacques Mertens
Skill Level to Build: 
easy, some epoxy experience useful

We designed a simple to build work boat with a vee-hull based on a proven work boat type, the Panga.

ETTA MAY

Designer: 
Peterson Associates, Inc.
Skill Level to Build: 
moderate

Auxiliary cruising sloop evolving from the Hudson River and Friendship sloops.

Excellent for single handling with 450 sq. ft. of working sails, open decks and large cockpit.

Arrangement includes two berths with optional pipe berths...

Delfini

Designer: 
Andrew Walters
Skill Level to Build: 
Intermediate

This is the 19′ x 6′ version of Delfini with a semi flat bottomed hull, i.e. a narrow flat central portion with V’d bilge panels. This should give a reasonable compromise between economy and rough water ability and the flat central section...

Volare Console

Designer: 
Andrew Walters
Skill Level to Build: 
beginner

‘Volare’ comes in two versions. This is the console version, the utility version is available as a separate set of plans. They’re both 15′4″ long and 5′ wide.

Her length is that of two sheets of 8′ plywood and she’s built in two halves (...

WITTHOLZ Angler

Designer: 
Charles Wittholz
Skill Level to Build: 
Intermediate to Advanced

A big, healthy, open skiff with sophisticated lines. Construction: Strip planking over sawn frames; double diagonal bottom. Alternative construction: Plywood lapstrake topsides. Lofting is required. Plans include 6 sheets

Palm Beach Runabout

Designer: 
Nelson Zimmer
Skill Level to Build: 
Advanced

This runabout reveals the influence of Zimmer’s association with John Hacker, and will require expert boatbuilders.

Construction: Batten-seam planking over sawn frames.

Lofting is required.

Plans include 4 sheets.