MODIFIED CANOE
John Horst writes "I designed and built (actually just built) this 16' x 4' boat for rowing and fishing on Cabbage Creek and the ICW in Ponte Vedra, FL." He used 5/16" cypress planking over resorcinol-laminated ash frames.
This section of our web site, an extension of the Launchings department of WoodenBoat magazine, is dedicated to sharing news of recently launched wooden boats built or restored by our readers.
If you’ve launched a boat within the past year, please email us at launchings@woodenboat.com, or post your news here.
(All posts are subject to approval and editing before being made live.)
To refine your search, add quote marks. If you search Wood Duck, you will get all the listings which include Wood and Duck. To refine, search “Wood Duck” and you’ll see just Wood Duck results.
John Horst writes "I designed and built (actually just built) this 16' x 4' boat for rowing and fishing on Cabbage Creek and the ICW in Ponte Vedra, FL." He used 5/16" cypress planking over resorcinol-laminated ash frames.
Jack Shenker lives between two lakes in New Jersey, so he needed to build two boats. He started by building LITTLE JOANIE, a Shellback dinghy for fishing on one of the lakes.
Lernort Studio is an educational institution subsidized by the city of Dusseldorf and the state of Northrhine-Westfalia in Germany offering classes to high school students. Sculptor Michael Kukulies supervised the construction of this proa by his woodworking students at studio.
After the 7 years of enjoyment from N’ SLOWER, we decided to build CLEAN N'LIGHT. N’ SLOWER still has a lifetime of joy to give but I grew restless. I yelled out to Preston, “I want to build something,” then I broke out the pad and pencil threw down a few lines that turned into a new project.
Traditional wood/canvas canoe: Rollin Thurlow-designed 13 ft American Beauty. Class-built at WB School summer of 2013 and finished by owner.
On June 17, 2015, Mark and Suzanne Nye launched their Shearwater Double at Silver Springs Florida. The kayak, built from kit by Chesapeake Light Craft, took approximately 135 hours over a six month period. Construction is stitch and glue with sapele deck and okume hull.
Ken Spring writes "Keith Matlack uses his 15'7" x 41" sharpie skiff, SQUALICORAX (Latin name of an extinct shark) for fossil hunting along the shores of the Chesapeake Bay.
I launched my boat July 27, 2015, I started the build on December 4, 2014. I have 814 hours in the build. The boat performs very Well. I installed a new 70 HP Yamaha 4 stroke outboard with the command link instrument package. The boat reached 29 MPH at 6200 RPM. Getting 5.4 MPG of fuel.
This is a 2013 new-build, designed by James-Craft; The Black Sheep is a reproduction Chris-Craft Kit Boat, 1956 Zephyr Runabout. I spent about 600 hours building her over the course of 4 summers — about 10 hours per week June-August. This is my first boat build.
I built this kayak for my grandson, who loves to fish. So I built a fishing kayak, with retractable outriggers. The outriggers are stitch and glue, the kayak is plywood on frame.
Located in Mystic, Connecticut - 3 staterooms and salon with A/C units, sleeps 8 - well maintaine
Wood hull built with meticulous and painstaking detail from a kit using a "stich-and-glue" method