Sailboats - Racing
START 55
Start 55 expands the range of self-construction project of our Studio.
If you’re in the market for a boat to build, this directory of Boat Plans & Kits is a fine place to start. And if your company sells plans or kits, we invite you to list your offerings here.
There is no charge for listing, but the FEATURED BOATS MUST BE BUILT OF WOOD.
To refine your search of this directory, use quotation marks. If you search Nutshell Pram Kit, you’ll receive all the listings that include the words Nutshell, Pram, and Kit. To refine your search, enter “Nutshell Pram Kit”; you’ll then see only the results for Nutshell Pram kits.
To refine your search, add quote marks. If you search Nutshell Pram Kit, you will get all the listings which include Nutshell, Pram, and Kit. To refine, search “Nutshell Pram Kit” and you’ll see just Nutshell Pram Kit results.
Start 55 expands the range of self-construction project of our Studio.
“Pinocchio” was commissioned by my 7 year old son who wanted to learn paddling. He saw these kids paddling in small plastic kayaks which looked more like “bricks” or “barges” rather than boats.
An open boat that rows with ease and swiftness and is stiff enough under sail to stand up to a breeze.
Construction: Carvel planked over steamed frames
Alternative construction: Lapstrake or strip
No lofting is required
Plans include 6 sheets
Shallow-draft, V-bottomed pocket cruiser with spartan accommodations for two.
Construction: Carvel planked over sawn frames
Alternative construction: Strip or plywood
Lofting is required.
Plans include 5 sheets.
Simplicity of construction, user friendliness (both for single or double) and high performance – all of this with reasonable costs. These are the main priorities which lie at the base of the DP 14’ design and which justify the main choices made, in particular:
Janus is a 4 berth trailable sailing catamaran built in sheet plywood. However, don’t be deceived by Janus’ simple dory shaped hulls (which make it a very easy boat to build). It has a lot of internal room for its length and a surprisingly good performance.
Based on traditional crabbing skiff documentation by Howard Chapelle, this has proven to be a fast and stable boat that can carry a real load.
This 32′ double-ended sharpie ketch will provide the amateur builder with a shoal-draft cruising boat of simple construction.
Construction: Plywood planking over sawn frames.
Lofting is required.
Plans include 4 sheets.
A wholesome auxiliary cruiser with accommodations for three. Construction: Carvel planked over steamed frames. Alternative construction: Cold-molded or strip. Lofting is required. Plans include 4 sheets.
Sweet-lined Acorn skiff designed by Iain Oughtred, completed in 1999 but still like new.
SOLD MAY 2026
NO MORE INQUIRIES
Rocklady, Sam Devlin design for builder/owner John Calogero, Sr.
Fiberglass bottom, trailer. Built in 2005 by Old Wharf Dory Company in Wellfleet, MA.